Question

Question 1

A process flowchart uses symbols to represent which of the following?

Factory location
Warehouse space available
Work force schedules
Flows of material or customers
Data analysis

Question 2

An activity-system map is which of the following?

A network guide to route airlines
A listing of activities that make up a project
A diagram that shows how a company’s strategy is delivered to customers
A facility layout schematic noting what is done where
A timeline displaying major planned events

Question 3

When deciding to add capacity to a factory which of the following need not be considered?

Maintaining system balance
The frequency of capacity additions
Use of external capacity
Immediate product demand
Availability of raw materials

Question 4

Which of the following is a basic type of process structure?

Process flow diagram
Product matrix
Process matrix
Workcenter
Manual assembly

Question 5

If the actual output of a piece of equipment during an hour is 500 units and it’s best operating level is at a rate of 400 units per hour, which of the following is the capacity utilization rate?

0.75
1.00
1.25
1.33
100

Question 6

In a workcenter, machine A has a ten minute set-up time per batch and a two minute per unit run time. Machine B performs the identical function but has a set-up time of thirty minutes and a one minute run time per unit. The workcenter makes products in batches ranging from one unit to one hundred units. Assuming capacity is not a limitation on either machine, on which batches should machine B be used?

All batches should be run on machine B
Batches of more than 20 units should be run on machine B
Batches of fewer than 80 units should be run on machine B
Batches with up to 50 units should be run on machine B
No batches should be run on machine B

Question 7

If all you knew about a production system was that total daily output was 400 units and the total labor necessary to produce the 400 units was 350 hours, what kind of productivity measure could you use to compute productivity?

Partial measure
Multifactor measure
Total measure
Global measure
All of the above

Question 8

Capacity planning involving acquisition or disposal of fixed assets such as buildings, equipment or facilities is considered as which one of the following planning horizons?

Intermediate-range
Long-range
Short-range
Current
Upcoming

Question 9

Which following production process term best describes the situation when activities in a stage of production must stop because there is no work?

Blocking
Buffering
Starving
Buffer
Setup time

Question 10

Which of the following is not considered a major process flow structure?

Work Center
Project
Assembly line
Fabrication
Continuous Flow

Question 11

You are hired as a consultant to decide if your client should purchase a new, highly specialized, piece of equipment. The product to be produced by this equipment is forecast to have a total worldwide demand of 15,000 units over the entire product life. The initial investment to acquire and install the equipment is $256,000. The variable cost to produce each unit will be $15 and the selling price for the finished product will be $30. Which of the following best describes the situation the firm is facing?

The company will recover its initial investment
The company’s total margin will be less than its investment
It’s a good investment
The break-even is lower than the 15,000 units that are expected to sell
All of the above

Question 12

An advantage of a make-to-stock process is which of the following?

Rapid delivery of a standard product
All units of output are unique
It responds directly to customer orders
It allows the firm to avoid inventory costs
It combines the best features of other processes

Question 13

Which of the following is not a benefit of a manufacturing cell layout?

Better human relations
Improved operator expertise
Less in-process inventory and material handling
Faster production setup
Reduced cost

Question 14

A process flowchart uses which of the following symbols to represent storage areas or queues in a flow diagram?

Rectangle
Arrow
Inverted triangle
Diamond
A dashed line

Question 15

Which of the following basic types of production layout formats is one which has similar equipment or functions are grouped together?

Production line layout
Assembly line layout
Workcenter layout
Group technology layout
Manufacturing cell layout

Question 16

A difference between project and continuous flow categories of process flow structures is which of the following?

The size of the product
Discrete parts moving from workstation to workstation
Degree of equipment specialization
Being a “Virtual Factory”
Profit per unit

Question 17

To reduce process throughput time you might try which of the following actions?

Outsource activities
Change the sequence of activities
Improve teamwork
Reduce management interference
Introduce incentive pay

Question 18

Which of the following is a partial measure of productivity?

Output/Materials
Output/(Labor + Capital + Energy)
Output/All resources used
Output/Inputs
All of the above

Question 19

Which of the following terms describes the time a unit spends actually being worked on together with the time spent waiting in a queue?

Cycle time
Flow time
Run time
Setup time
Efficiency

Question 20

Which of the following is not a basic type of process structure?

Product-process matrix
Workcenter
Manufacturing cell
Assembly line
Continuous process

Question 21

According to Little’s law, which of the following can be used to estimate inventory?

Process time/Cycle time
Throughput rate times flow time
Process velocity/flow time
Set up time/Throughput rate
Value added time/Process velocity

Question 22

Assume a fixed cost for a process of $15,000. The variable cost to produce each unit of product is $10 and the selling price for the finished product is $25. Which of the following is the number of units that has to be produced and sold to break-even?

500 units
667 units
790 units
900 units
1,000 units

Question 23

Which of the following is a measure of operations and supply management efficiency used by Wall Street?

Dividend payout ratio
Current ratio
Receivable turnover
Earnings per share growth
Financial leverage

Question 24

Which of the following basic types of process structures is one which equipment or work processes are arranged according to the progressive steps by which the product is made?

Project
Workcenter
Manufacturing cell
Assembly line
Continuous process

Question 25

Which of the following best describes the term cycle time?

Average time between completions of successive units
Ratio of the time a resource is activated over its use
Can be no more that 60 minutes
The same as utilization
The labor content of the item being measured

Question 26

A process flowchart uses which of the following symbols to represent a decision point in a flow diagram?

Rectangle
Arrow
Inverted triangle
Diamond
A dashed line

Question 27

Using the assembly-line balancing procedure, which of the following is the theoretical minimum number of workstations if the task times for the six tasks that make up the job are 4, 6, 7, 2, 6, and 5 minutes, and the cycle time is 10 minutes?

3
5
6
8
None of the above

Question 28

The ability to rapidly and inexpensively switch production from one product to another enables what are sometimes referred to as:

Economies of scale
Economies of size
Economies of shape
Economies of scope
Economies of shipping

Question 29

According to Little’s Law, which of the following ratios is used to find flow time?

Cycle time/Process time
Throughput time/Process velocity
Process velocity/Throughput time
Inventory/Throughput rate
Value added time/Process velocity

Question 30

Which of the following basic types of process structures is one which similar equipment or functions are grouped together?

Project
Workcenter
Manufacturing cell
Assembly line
Continuous process

Question 31

To reduce process flow time you might try which of the following actions?

Perform activities in parallel
Change the sequence of activities
Reduce interruptions
Acquire additional

Our website has a team of professional writers who can help you write any of your homework. They will write your papers from scratch. We also have a team of editors just to make sure all papers are of HIGH QUALITY & PLAGIARISM FREE. To make an Order you only need to click Ask A Question and we will direct you to our Order Page at WriteDemy. Then fill Our Order Form with all your assignment instructions. Select your deadline and pay for your paper. You will get it few hours before your set deadline.

Fill in all the assignment paper details that are required in the order form with the standard information being the page count, deadline, academic level and type of paper. It is advisable to have this information at hand so that you can quickly fill in the necessary information needed in the form for the essay writer to be immediately assigned to your writing project. Make payment for the custom essay order to enable us to assign a suitable writer to your order. Payments are made through Paypal on a secured billing page. Finally, sit back and relax.

Do you need an answer to this or any other questions?

About Writedemy

We are a professional paper writing website. If you have searched a question and bumped into our website just know you are in the right place to get help in your coursework. We offer HIGH QUALITY & PLAGIARISM FREE Papers.

How It Works

To make an Order you only need to click on “Order Now” and we will direct you to our Order Page. Fill Our Order Form with all your assignment instructions. Select your deadline and pay for your paper. You will get it few hours before your set deadline.

Are there Discounts?

All new clients are eligible for 20% off in their first Order. Our payment method is safe and secure.

Hire a tutor today CLICK HERE to make your first order